Week 0 - Checkpoint

less than 1 minute read

After a while we resume the current situation of the project with the networks that have been trained and raised.

Checkpoint

The green color indicates good network results, the orange indicates that the path is adequate although the results can be improved and the red poor results. The color black has been used for those scenarios that have been raised but not developed and gray for those that have not come up because it is meaningless.